Task List

Projects. This is the never-ending list of things that have yet to be finished.

Task Started Completed
Install EPIRB 08/21/09 ——–
Repair internal Lights /Upgrade to LED ——– ——–
Repair forwardberth door latch ———- ———-
Do Mast / Boom Mounted Winch Maintenance 11/10/2009 ——–
Repair/recharge Refrigeration System. Add shore power compressor (12VDC/120VAC) ——– ——–
Install GFI outlets in head and galley ——– ——–
Fabricate new Mattress for Captains Cabin ——– ——–
Modify Shore Power system to Accept 220VAC ——– ——–
Repair/Replace Water Heater ——– ——–
Build Computer/Entertainment cabinet 05/15/09 ——–
Replace cabinet latches ——– ——–
Fix creaking deck sole ——– ——–
Design a way to empty blackwater tanks while underway ——– ——–
Install Anchor & Chain washdown pump ——– ——–
Clean Bilge ——– ——–
Reorganize tools ——– ——–
Clean / re-do tach and starter connectors ——– ——–
Clean and diagram drinking wqater system ——– ——–
Tidy plumbing for shower sump pump ——– ——–
Install Deck grab handles ——– ——–
Reorganize Grab-N-Go bag ——– ——–

Completed Tasks

Task Started Completed
Repair Floor Support 12/07/08 12/07/08
Brace Floor Support 12/07/08 02/01/09
Install Smoke Detectors 12/15/08 12/15/08
Fix Galley Sink Light 12/07/08 12/07/08
Repair Fathometer 12/08/08 12/08/08
Clean/repair propane solenoid wiring 01/11/09 01/11/09
Repair/replace mast boot 01/11/09 01/11/09
Repair Counter Lip 12/07/08 02/12/09
Get FCC Ships Radio License 02/15/09 03/01/09
Have Rigging Inspected 12/20/08 12/20/08
Do Jib Sheet / Main Sheet Winch Maintenance 01/15/09 01/30/09
Repair Frozen Sheet Block 01/30/09 01/30/09
Service Fire Extinguishers 01/14/09 02/07/09
Replace outdated Flares 02/06/09 02/06/09
Replace aft head hose clamps 12/29/08 12/29/08
Fix Head Hoses 12/29/08 03/10/09
Service Thru-hull ball valves 04/01/09 04/25/09
Install Starter Battery in box 01/20/09 02/12/09
Find/Fix Starbord side Freshwater tank leak 01/15/09 01/15/09
Replace foreward blackwater tank Thank you Ronco!! 04/15/09 05/15/09
Install SSB Radio 02/07/09 02/12/09
Clean Racor Fuel Filter bowl 02/20/09 02/22/09
Repair Main Sail 06/15/09 07/10/09
Replace/Repair knotmeter sensor 07/05/09 07/05/09
Repair/replace main compass 07/30/09 08/01/09
Repair/maintain bow rollers 08/03/09 08/03/09
Install MOB Pole 08/15/09 08/16/09
Install Lifesling 08/15/09 08/20/09
Replace missing oil lamp glass 08/18/09 08/18/09
Rebuild Steering gear case 08/21/09 08/24/09
Sort / Consolidate tool boxes 08/28/09 08/30/09
Repair / replace Radar 08/24/09 09/02/09
Add AIS antenna – Scheduled 9/22 09/24/09 09/24/09
WiFi Radio antenna at mast top – Scheduled 9/22 09/24/09 09/24/09
Repair or Replace Starter Solenoid on Diesel Engine (buy spare) 09/23/09 09/24/09
Add backup VHF antenna 09/24/09 09/24/09
Repair Wind Speed Sensor 09/29/09 09/29/09
Replace Mast Boot 10/01/09 10/01/09
Seal Chainplate leaks 09/29/09 09/29/09
Find/Fix Port side Dorade box leak 09/29/09 09/29/09
Find place for Liferaft 08/16/09 10/10/2009
Repair Dodger 08/01/09 10/09/2009
Install / Document Ships batteries 09/25/09 10/08/2009
Remove/repair/replace Windlass Motor 12/08/2009 1/20/2010
Design / Install Solar Power upgrade – Scheduled 9/22 10/01/09 10/10/2009
Repair HF Antenna ground plane
12/07/08 12/30/2009
Add Lee Clothes 01/01/1010 01/30/2010
Rewire Bilge pump, remove splices 03/01/2010 03/15/2010
Build wrist rocket for sea birds 01/01/2010 01/012010