Task List
Projects. This is the never-ending list of things that have yet to be finished.
| Task |
Started |
Completed |
| Install EPIRB |
08/21/09 |
——– |
| Repair internal Lights /Upgrade to LED |
——– |
——– |
| Repair forwardberth door latch |
———- |
———- |
| Do Mast / Boom Mounted Winch Maintenance |
11/10/2009 |
——– |
| Repair/recharge Refrigeration System. Add shore power compressor (12VDC/120VAC) |
——– |
——– |
| Install GFI outlets in head and galley |
——– |
——– |
| Fabricate new Mattress for Captains Cabin |
——– |
——– |
| Modify Shore Power system to Accept 220VAC |
——– |
——– |
| Repair/Replace Water Heater |
——– |
——– |
| Build Computer/Entertainment cabinet |
05/15/09 |
——– |
| Replace cabinet latches |
——– |
——– |
Fix creaking deck sole |
——– |
——– |
| Design a way to empty blackwater tanks while underway |
——– |
——– |
| Install Anchor & Chain washdown pump |
——– |
——– |
| Clean Bilge |
——– |
——– |
| Reorganize tools |
——– |
——– |
| Clean / re-do tach and starter connectors |
——– |
——– |
| Clean and diagram drinking wqater system |
——– |
——– |
| Tidy plumbing for shower sump pump |
——– |
——– |
| Install Deck grab handles |
——– |
——– |
| Reorganize Grab-N-Go bag |
——– |
——– |
Completed Tasks
| Task |
Started |
Completed |
| Repair Floor Support |
12/07/08 |
12/07/08 |
| Brace Floor Support |
12/07/08 |
02/01/09 |
| Install Smoke Detectors |
12/15/08 |
12/15/08 |
| Fix Galley Sink Light |
12/07/08 |
12/07/08 |
| Repair Fathometer |
12/08/08 |
12/08/08 |
| Clean/repair propane solenoid wiring |
01/11/09 |
01/11/09 |
| Repair/replace mast boot |
01/11/09 |
01/11/09 |
| Repair Counter Lip |
12/07/08 |
02/12/09 |
| Get FCC Ships Radio License |
02/15/09 |
03/01/09 |
| Have Rigging Inspected |
12/20/08 |
12/20/08 |
| Do Jib Sheet / Main Sheet Winch Maintenance |
01/15/09 |
01/30/09 |
| Repair Frozen Sheet Block |
01/30/09 |
01/30/09 |
| Service Fire Extinguishers |
01/14/09 |
02/07/09 |
| Replace outdated Flares |
02/06/09 |
02/06/09 |
| Replace aft head hose clamps |
12/29/08 |
12/29/08 |
| Fix Head Hoses |
12/29/08 |
03/10/09 |
| Service Thru-hull ball valves |
04/01/09 |
04/25/09 |
| Install Starter Battery in box |
01/20/09 |
02/12/09 |
| Find/Fix Starbord side Freshwater tank leak |
01/15/09 |
01/15/09 |
| Replace foreward blackwater tank Thank you Ronco!! |
04/15/09 |
05/15/09 |
| Install SSB Radio |
02/07/09 |
02/12/09 |
| Clean Racor Fuel Filter bowl |
02/20/09 |
02/22/09 |
| Repair Main Sail |
06/15/09 |
07/10/09 |
| Replace/Repair knotmeter sensor |
07/05/09 |
07/05/09 |
| Repair/replace main compass |
07/30/09 |
08/01/09 |
| Repair/maintain bow rollers |
08/03/09 |
08/03/09 |
| Install MOB Pole |
08/15/09 |
08/16/09 |
| Install Lifesling |
08/15/09 |
08/20/09 |
| Replace missing oil lamp glass |
08/18/09 |
08/18/09 |
| Rebuild Steering gear case |
08/21/09 |
08/24/09 |
| Sort / Consolidate tool boxes |
08/28/09 |
08/30/09 |
| Repair / replace Radar |
08/24/09 |
09/02/09 |
| Add AIS antenna – Scheduled 9/22 |
09/24/09 |
09/24/09 |
| WiFi Radio antenna at mast top – Scheduled 9/22 |
09/24/09 |
09/24/09 |
| Repair or Replace Starter Solenoid on Diesel Engine (buy spare) |
09/23/09 |
09/24/09 |
| Add backup VHF antenna |
09/24/09 |
09/24/09 |
| Repair Wind Speed Sensor |
09/29/09 |
09/29/09 |
| Replace Mast Boot |
10/01/09 |
10/01/09 |
| Seal Chainplate leaks |
09/29/09 |
09/29/09 |
| Find/Fix Port side Dorade box leak |
09/29/09 |
09/29/09 |
| Find place for Liferaft |
08/16/09 |
10/10/2009 |
| Repair Dodger |
08/01/09 |
10/09/2009 |
| Install / Document Ships batteries |
09/25/09 |
10/08/2009 |
| Remove/repair/replace Windlass Motor |
12/08/2009 |
1/20/2010 |
| Design / Install Solar Power upgrade – Scheduled 9/22 |
10/01/09 |
10/10/2009 |
Repair HF Antenna ground plane
|
12/07/08 |
12/30/2009 |
| Add Lee Clothes |
01/01/1010 |
01/30/2010 |
| Rewire Bilge pump, remove splices |
03/01/2010 |
03/15/2010 |
| Build wrist rocket for sea birds |
01/01/2010 |
01/012010 |